Power generator HIMOINSA HFW-125 T5 IVECO open
Power generator HIMOINSA HFW-125 T5 IVECO open is not in stock and will be shipped as soon as available again.
Delivery time: approx. 16 weeks
Collection possible from warehouse Fabrikstr. 1
Collection date after consultation
Questions to the product?
Questions to the product?
Shipping Information
Shipping Information
Shipping costs are calculated based on the weight and the destination country. A shipping cost calculator for the entire contents of the shopping cart is available here on the product page (below the price information).
We ship up to approx. 30 kg with parcel service. We ship items with higher weight using general cargo freight forwarding or, in the case of large units, by direct transport.
Please contact us if you have special delivery requirements.
HIMOINSA · Industrial diesel generator · STAMFORD configuration
HIMOINSA HFW-125 T5 STAMFORD open
The HIMOINSA HFW-125 T5 is a stationary open-frame three-phase diesel generator, rated at 120 kVA (96 kW) PRP and 130 kVA (104 kW) ESP. A FPT/IVECO NEF45TM3 engine drives a STAMFORD UCI274D alternator with electronic AVR voltage control. This generator supplies 400/230 V at 50 Hz and has a 170-litre fuel tank. Check the site-specific emission rules, especially for earlier engine classes.
Key specifications
Advantages and equipment
Typical applications
Stationary industrial power and engineered emergency standby installations. Appropriate electrical distribution, cable protection, grounding and starting-current sizing must be engineered for the intended installation.
Stationary HIMOINSA HFW-125 T5 diesel generator for industrial standby power
The 120 kVA diesel generating set supports stationary power applications subject to correct engine duty rating, electrical load and local approval. The open-frame version can be selected according to installation conditions; a suitable switchboard and protection system must be specified separately.
With a 170-litre tank and FPT/IVECO diesel engine, the set combines industrial power generation with professional control options. Distinguish between PRP and emergency ESP duty rather than treating both ratings as unlimited continuous output.
Technical highlights
Choosing and installing the correct generator
Load profile: Motor starting currents, power factor, load variation and phase balance affect generator sizing. Prime and standby rating conditions must follow the applicable technical documentation.
Electrical protection: Terminal connections, switchboard, earth leakage protection and output protection must be verified in the final equipment list.
Emission permission and grid changeover: Stage 2 and Stage 3A versions require careful site-specific legal review. Backup feeding a building requires correctly designed switching with safe utility separation.
Technical specifications
Planning industrial or emergency standby generation?
SEV supports generator sizing, control-panel design, mains changeover, protection and project-specific equipment selection.
-
Start system
Payment & Security
Payment methods:
Your payment information is processed securely. We do not store any credit card details and do not have access to your credit card details.
