Power Generator Stager FD 10000ER-E3R Automatic
Power Generator Stager FD 10000ER-E3R Automatic is not in stock and will be shipped as soon as available again.
Delivery time: approximately 6 days
Collection possible from warehouse Fabrikstr. 1
Collection date after consultation
Questions to the product?
Questions to the product?
Shipping Information
Shipping Information
Shipping costs are calculated based on the weight and the destination country. A shipping cost calculator for the entire contents of the shopping cart is available here on the product page (below the price information).
We ship up to approx. 30 kg with parcel service. We ship items with higher weight using general cargo freight forwarding or, in the case of large units, by direct transport.
Please contact us if you have special delivery requirements.
STAGER / YORKING · AVR · 50 Hz
Stromerzeuger Stager FD 10000ER-E3R Automatic
The Stromerzeuger Stager FD 10000ER-E3R Automatic is a generator with AVR voltage regulation powered by gasoline. It provides 8 kW rated output and 8.5 kW maximum output at 50 Hz. Engine: YH192FB (458 cm³). The fuel tank holds 25 L; the selected electrical output is 230 / 400 V selectable. Net weight: 97 kg.
Key specifications
Advantages and equipment
Typical applications
The STAGER FD 10000ER-E3R is designed for construction sites, agricultural equipment, professional mobile supplies and engineered standby. The real output terminals, motor starting currents and protective devices must be checked before operation.
STAGER FD 10000ER-E3R generator for professional power
With 8 kW rated output and 8.5 kW maximum power, this model is designed for load planning according to its real voltage and connection configuration. The AVR system supports the intended electrical operation at 50 Hz.
Switch between 230 V and 400 V only with loads disconnected. The older 13-hour runtime claim at 75% load is inconsistent with the documented fuel consumption.
Technical highlights
How to size and connect safely
Use rated power for continuous-load planning, not the maximum/peak figure. Check outlet limits and motor starting currents. Feeding a building requires correctly interlocked changeover, appropriate network separation, earthing and professional electrical installation.
Switch between 230 V and 400 V only with loads disconnected. The older 13-hour runtime claim at 75% load is inconsistent with the documented fuel consumption.
Technical specifications
Advice on power supply and standby systems
SEV can help with load sizing, safe connection, generator selection and compatible accessories.
Request advice-
Start system
Payment & Security
Payment methods:
Your payment information is processed securely. We do not store any credit card details and do not have access to your credit card details.





